Bayview on the MOVE...

June 2017 - we added a second ZMD vacuum former, a single-sided 36"x36" PLC-controlled unit, with rapid cycling capability to increase throughput for a reduced unit cost. We also purchased a 9"x23" Stallion Trunnion to add 4-axis capability to one of our 6 Fadal CNC milling centers.

 

June 2016 - we just took delivery of our third Kern HSE (High Speed Engraving) Laser with the same large 52" x 100" cutting/engraving surface as our first two lasers, but with a much more powerful 400 Watt laser. More power = more speed = quicker turnaround time.

 

December 2015 - we now have a second Kern HSE (High Speed Engraving) Laser with a 52" x 100" cutting surface, but with a more powerful 250 Watt laser.

 

November 15th 2011 we installed our new semi-automatic 42" wide roller die-cutter.

 

Bayview Plastic Solutions, Inc. has become a Certified DBE throught the California Unified Certification Program (CUCP). This certification is recognised through the U.S. Department of Transportation (DOT) as of January 11, 2010.

 

Purchased a new 13"x40" Gear-Head Gap Bed Engine Lathe in November 2009.

 

As of March 30, 2008 we now have a double-sided 60"x60" per side, PLC controlled, ZMD vacuum former.

 

We recently added another Fadal 4020 milling center, which now make 3-total, to our CNC milling capabilities.

 

September 2007 we put into production our brand new CNC Router System, which is a welcome addition to our current machining capabilities. This newly acquired system has an oversized machining area of 60”x120” with a Z-axis clearance of 12”.

 

August 27, 2007 - Bayview Plastic Solutions has now added new 3D design software to take full advantage of, and to boost, the overall capabilities and performance of our CNC machining department.

July 9, 2007 - We have increased our current vacuum-forming capabilities (48”x48”, by 19” stroke), which now includes the ability to process material blanks up to 60”x60" with machine Top & Bottom strokes of ~30”.

June 2007 - Bayview Plastic Solutions has recently installed E2 ShopTech as our new ERP manufacturing system software. This software package supports our entire    manufacturing/operations infrastructure giving us up to the minute information on: RFQ’s, manufacturing project status, inventory management, and much more to better serve our customers requirements for on-time deliveries, and optimum part pricing.

May 1, 2007 - Bayview Plastics Solutions doors open for our first day of business in Fremont, California.

February 5, 2007 - We incorporate the business name through the state of California as Bayview Plastic Solutions, Inc.